- Quotes in 24–72 hours (not 20–30 days) with apples-to-apples sheets
- Samples in 2–4 weeks (not 4–6), golden-sample plan included
- QC at three gates (DuPro → Final → Loading) instead of ad-hoc final only
- Compliance ready (REACH/CPSIA/RoHS/GOTS/IMDS lab plan + docs) vs vendor-led guesswork
- Live visibility with milestones, photos, and doc room—not email chaos
Expanded benchmark table
| Benchmark metric | Without IndiaUnbox | With IndiaUnbox | Buyer impact |
| Quote speed (days) | 20–30 | 5–10 | Start sooner; shave weeks off RFQ |
| Supplier response rate | 20–40% | 70–90% (pre-vetted pool) | Fewer dead ends; better price discovery |
| Apples-to-apples costing | Manual, inconsistent | Normalized sheet (EXW→DDP, duty, freight, surcharges) | Fast, confident comparison |
| Samples to hand | 4–6 weeks | 2–4 weeks | Quicker go/no-go decisions |
| Spec discipline | Basic email specs | Spec Pack + BOM + tolerances + AQL | Fewer misunderstandings |
| QC coverage | Ad-hoc final only | DuPro + Final + Loading (AQL agreed) | Defects caught before ship |
| Compliance readiness | Vendor-led | Lab plan + reports (REACH/CPSIA/RoHS/GOTS/IMDS by category) | Market-ready paperwork |
| Visibility | Email threads | Live tracker (samples → PSI → ETD/ETA), photo/video evidence | Control without travel |
| Tooling/IP | Ambiguous ownership | Contracts with tooling ownership, NDA, SKU exclusivity (as needed) | Lower IP leakage risk |
| Logistics | Buyer to arrange | EXW→DDP options + doc pack | Fewer handoffs, fewer errors |
| OTIF target | 80–90% typical | ≥95% | Smoother launches |
| First-pass yield (RFT) | 92–96% | ≥98% | Less rework, faster throughput |
| Cycle time: RFQ → PO | 8–12 weeks | 4–7 weeks | Earlier revenue / season hit |
| Change control | Email approvals | Change log + rev-locked golden sample | Traceability if things drift |
| Supplier development | One-off | Scorecard + QBRs + VA/VE | Cost-downs over time |
Ranges shown are typical for mid-market consumer goods and engineered components. We’ll publish program-specific KPIs in your dashboard.
What we do differently (stage by stage)
1) RFQ & costing (Day 0–3)
- Translate your brief into a Spec Pack (materials, finishes, tolerances, testing, packaging).
- Hit the right cluster and broadcast to pre-audited vendors.
- Return a Quote Pack in 24–72h: 3–5 quotes, MOQs, lead times, EXW→DDP costing, duty & freight modeled by HS code.
- Outcome: immediate, like-for-like comparison instead of piecing together emails.
2) Diligence & shortlist (Week 1)
- Factory scorecards (Quality, Compliance, Capacity, Cost, Communication).
- Desktop + on-ground audits where needed (ISO/IATF/BSCI/SEDEX).
- Outcome: shortlisted 1–2 factories with risk notes and sample ETA.
3) Sampling & spec lock (Weeks 2–4)
- T0/T1/T2 cycles to a Golden Sample, color/finish standards, AQL plan agreed (e.g., Gen II, Major 2.5 / Minor 4.0).
- Outcome: rev-locked reference that QC enforces.
4) Pilot & first article
- For engineered parts: FAI/PPAP (Lvl 3), capability (Cp/Cpk ≥1.33 on critical), GR&R, material certs.
- Outcome: issues show up in pilot, not in the container.
5) Production & QC gates
- DuPro checks at defined operations → Final inspection → Loading supervision with seal log.
- Outcome: defect Pareto + corrective actions before cargo moves.
6) Compliance & documentation
- Lab plan per SKU, test booking, certificates uploaded to your doc room.
- Outcome: market-ready paperwork for customs and retail audits.
7) Logistics & delivery
- Port/ICD selection, stuffing photos, insurance, customs clearance; DDP available.
- Outcome: fewer handoffs; clean paper trail (CI/PL/COO/BL/VGM/ISPM-15 etc.).
Real-world example (typical SKU)
Metal candleholder set (3 sizes), plated + lacquer, retail pack
- Without: 26 days to 2 valid quotes, sample at Day 39, plating spec drift caught at PSI, 1-week rework, 12% air-freight to hit ship date.
- With IndiaUnbox: quotes by Day 3, samples Day 17; plating μm documented; PSI pass first-time; ocean as planned.
Net effect: ~5 weeks saved, no air premium, clean compliance binder.
Proof & governance
- Live tracker: samples, approvals, inspections, ETD/ETA → all in one timeline.
- Data room: specs, POs, inspection reports, photos, lab results, shipping docs.
- Supplier management: scorecards, CAPA tracking, QBRs; under-performers are rotated out.
- Commercial peace of mind: clear fees, no hidden factory commissions; escrow/tooling options.
FAQs
What if a category needs more time?
Highly engineered SKUs or new tooling might exceed 72h for quotes; we flag it on Day 1 with the reason and a revised SLA.
Can you work with my current supplier?
Yes. We can onboard and manage them under the same QC/compliance framework.
Do you ship DDP?
Yes—EXW→DDP with duty/freight modeled for your market.
What’s the minimum order?
Cluster-dependent. Many categories support flexible MOQs for pilots.