Manufacturing Clusters (Map)

Find the right hub by category with typical MOQs/lead times.
Chips: Tiruppur (knits) • Rajkot (engineering) • Moradabad (brass) • Jodhpur (furniture)

How this map helps

Browse India’s top manufacturing hubs, see what each cluster is best at, and get indicative MOQs, sample timelines, and production lead times—so you can plan feasibility before you post an RFQ.
CTAs: Start RFQ (24–72h shortlist) • Book a Factory Visit

Tiruppur (Knits)

Best for: T-shirts, polos, athleisure, kidswear, basics, private-label programs.
Strengths: Vertical mills, fast color approvals, large capacity for repeats, export-ready.
Typical MOQs & timelines:

  • Sampling: PPS/TOP in 10–14 days after fabric lock
  • Production: 25–35 days for 2,000–10,000 pcs (style-dependent)
  • MOQ: 500–1,000 pcs/style per color (smaller possible with surcharge)
    Compliance & QA: Oeko-Tex/GOTS/BCI options; REACH/CPSIA tests; needle policy, metal detection.
    Watch-outs: Shade variation across dye lots; monsoon logistics buffers; fabric mill lead time on specialty blends.
    Nearest logistics: Coimbatore (air), Tuticorin/Chennai (sea).
    CTA: Share Tech Pack for Quote

Rajkot (Engineering)

Best for: CI/SG iron castings, precision-machined parts, pump bodies, agri/industrial components.
Strengths: Foundry ecosystem, CNC + surface finish, heat-treat access, competitive tooling.
Typical MOQs & timelines:

  • Sampling: T1 cast + rough machine in 15–20 days; T2 with finish in 25–35 days
  • Production: 30–45 days for 1–5 MT mix; larger lots by plan
  • MOQ: 300–1,000 pcs/part or ≥500 kg melt (process-dependent)
    Compliance & QA: FAI/PPAP-lite, NDT (DPI/MPI), pressure/leak tests, CoC; Cp/Cpk on CTQs where relevant.
    Watch-outs: Porosity/gating design, alloy availability, paint/powder cure windows.
    Nearest logistics: Mundra/Pipavav (sea), Ahmedabad (air).
    CTA: Upload Drawing + BOM

Moradabad (Brass)

Best for: Brass/metal home décor, tableware, barware, candleware, giftware; mixed metal/wood accents.
Strengths: Handcraft + semi-mechanized finishing, plating/lacquer options, rapid sampling for new designs.
Typical MOQs & timelines:

  • Sampling: 10–15 days for finish & form; complex sets 20–25 days
  • Production: 30–45 days for 500–3,000 units (SKU mix allowed)
  • MOQ: 200–500 pcs/SKU (lower feasible for premium finishes)
    Compliance & QA: Lead/cadmium limits, food-contact (where applicable), coating adhesion & salt-spray; REACH where needed.
    Watch-outs: Finish consistency (antique/hand patina), lacquer durability, line capacity around peak season.
    Nearest logistics: ICD Moradabad/Delhi → Nhava Sheva (sea), Delhi (air).
    CTA: Request Finish Board + Samples

Jodhpur (Furniture)

Best for: Solid-wood furniture, metal-frame furniture, sheesham/mango wood, industrial/boho styles.
Strengths: Wood sourcing + kiln drying, metal fabrication, hand finishes, flat-pack know-how, ISTA packaging.
Typical MOQs & timelines:

  • Sampling: 20–30 days (finish + stability checks)
  • Production: 45–60 days for 1×40’ HC (mixed SKUs) after PPS
  • MOQ: 20–50 pcs/SKU or container-level mix
    Compliance & QA: FSC options, VOC/finish tests, load/stability, moisture control, transit drop tests.
    Watch-outs: Moisture/seasoning (monsoon buffers), hardware availability, carton strength for flat-pack.
    Nearest logistics: ICD Jodhpur → Mundra/Pipavav (sea); Jaipur (air for samples).
    CTA: Book Factory Tour + PPS

Using the map (3 quick steps)

  1. Pick a cluster that matches your product.
  2. Check the ranges (MOQ, sample, production) and note any watch-outs.
  3. Post an RFQ to receive a verified shortlist and quotes in 24–72 hours.

Note: All ranges are indicative and vary by spec, finish, volume, and supplier capacity. Verified numbers are provided post-RFQ.

WhatsApp Chat with us