The business case: resilience, cost, policy tailwinds, and reliable lead times.
Chips: Landed cost drivers • Supplier depth • Policy incentives
The short answer
India gives you custom manufacturing with sane MOQs, export-ready suppliers across deep clusters, and policy momentum—so you can dual-source or shift SKUs without blowing up cost or timelines.
CTAs: Start RFQ (24–72h shortlist) • See Cluster Map • Request Duty & Logistics Preview
Landed Cost Drivers (what really moves the needle)
Total cost ≠ ex-factory price. We model the full stack so your decision is grounded:
- Materials & Process: Competitive in metals (castings/forgings/CNC), packaging, textiles, leather, wiring harness, and many plastics/rubber programs.
- Tooling & Setup: Practical options (soft → hard tooling, MUD bases, die duplication/move) to keep CapEx lean.
- Freight & Logistics: Strong connectivity via Nhava Sheva (JNPT), Mundra, Chennai, Tuticorin, Kolkata; predictable schedules and multi-forwarder options.
- Duties & Taxes: Landed-cost planning with HS-code guidance; we provide a FOB→DDP preview before you commit.
- Quality Cost: AQL-driven QC (DUPRO/PSI), rework loops, and supplier CAPA reduce hidden costs you’d otherwise see post-arrival.
CTA: Get a Landed-Cost Preview
Supplier Depth (built for custom work)
India’s manufacturing is clustered—you get specialization plus scale:
- Tiruppur (knits) for speed & private label basics
- Rajkot (engineering) for castings, machining, pumps
- Moradabad (brass/metal décor) for design-rich, finish-sensitive SKUs
- Jodhpur (furniture) for wood/metal frames & flat-pack know-how
- Coimbatore (pumps/motors) • Surat (textiles) • Jaipur (gems/hardware) • Ludhiana (cycles/fasteners) • Aligarh (hardware) • Bhiwandi (packaging)
What this means for you: faster sampling, lower risk of single-supplier lock-in, and real choices on finish, compliance, and price.
CTA: Browse Cluster Map
Policy Tailwinds (ease of doing+compliance readiness)
- Manufacturing push: Multi-year programs that encourage capacity expansion and export competitiveness.
- Single-window & state incentives: Faster utilities, land/ESDM/textile parks in key states, and cluster-level support.
- Compliance ecosystem: Lab partners for REACH/RoHS/CPSIA/EN/FDA contact testing; standardized documentation packs to clear customs smoothly.
What this means for you: easier onboarding, clearer compliance paths, and suppliers aligned with export standards from day one.
CTA: Request Compliance Pack
Lead-Time Reliability (plan, then execute)
- Transparent calendars: Seasonality and holiday planning built into your schedule (we buffer monsoon/festival periods by cluster).
- Milestone control: RFQ → T1/T2 samples → PPAP/FAI (where applicable) → pilot run → ramp, each with pass/fail gates.
- QC turnaround: Photo/video DUPRO and PSI reports within 24–48h of inspection.
Result: predictable sample cycles and production windows you can actually book freight against.
CTA: View the 90-Day Transition Blueprint
Where India wins first (start here)
- Castings/Forgings & CNC • Packaging (flexible/corrugated/labels) • Wire Harness & Electromech
- Textiles & Home Textiles • Leather Goods & Footwear • Hardware & Fasteners
These categories see strong supplier depth, export discipline, and healthy cost/lead-time balance.
CTA: Open Category Playbooks
Risk Controls (baked in)
- Dual-source setup to keep continuity while India ramps.
- Tooling custody & IP clauses (move vs. recut decision tree).
- Tier-2 inputs locked early (resins, trims, coatings) with approved alternates.
- Port flexibility (e.g., Mundra vs. JNPT) to bypass congestion.
What you get with IndiaUnbox
- Shortlist in 24–72 hours (2–3 vetted factories matched to your spec, MOQ, and compliance needs)
- DFM/should-cost notes to tune specs without hurting function
- AQL QC (DUPRO/PSI) and compliance testing scheduled in-flow
- FOB→DDP landed-cost preview before the PO
Primary CTAs: Start RFQ (24–72h shortlist) • See Cluster Map • Request Duty & Logistics Preview • Download RFQ Checklist (PDF)
Note: All ranges and statements are indicative and depend on specification, volume, and supplier capacity. Verified numbers are provided post-RFQ.